Projects

OUR RECENT PROJECTS

Building - Concrete
The residential development included the construction of a reinforced concrete frame with in-situ walls, beams and Read more
The multi Award Winning "Titanic Signature Building" was constructed recording the largest single concrete pour of 4,200m3 Read more
Building 5 scheme consisted of 324 build to rent apartments in two 18-storey tower blocks. Reinforced concrete works was Read more
Student accommodation in York Street, Belfast. The Project consisting of 717 beds and ranges from 11 to 15 storeys. The Read more
Building - Concrete

Project Information

Location: Malahide, Dublin 13

Year Complete: 2017

Client: Shannon Homes

Description: Residential development

The residential development included the construction of a reinforced concrete frame with in-situ walls, beams and floorscreeds throughout. The building utilized precast concrete floorslabs for construction. A significant scheme serviced by three Liebherr tower cranes during construction.

Utilities - Condominium


Project Information

Location: Belfast

Year Complete: 2011

Client: Harcourt Construction

Description: Tourist attraction

The multi Award Winning “Titanic Signature Building” was constructed recording the largest single concrete pour of 4,200m3 across 3,800m2 over a 24hr period.

The building consisted of 30,000m2 multistorey basement carpark, four inclining concrete cores, concrete screed to metal decking.

Peri Trio panel system and Variokit Engineering Construction Kit assisted the construction of the four inclining stair cores.


Project Information

Location: Kingston Street, Buchannan Wharf, Glasgow

Year Complete: 2021

Client: Graham

Description: Building 5 scheme consisted of 324 build to rent apartments in two 18-storey tower blocks. Reinforced concrete works was constructed using jump formwork to the 3 Lift and Stair cores.

Luffing tower cranes have been critical to the success of the structure including the Potain MRH175 and Saez SLH205. In addition, two static concrete pumps and placing booms have been used to assit construction works.


Project Information

Location: Belfast

Year Complete: 2021

Client: Graham

Description: Student accommodation in York Street, Belfast. The Project consisting of 717 beds and ranges from 11 to 15-storeys. Structural frame was constructed with the Stair & Lift cores being jumped to level 10 before works commenced on the lower floor levels.